Exact replica can't be made
Production time: Everything depends on the time of year. In winter oil paintings dry for a long time. In the summer faster. 1.5 - 2 weeks is spent on training. Week - painting a picture. And 2-3 weeks - drying textured brush strokes. Therefore, the production time is approximately 1.5 months.